Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.11960/1341
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorPontes, Hugo-
dc.contributor.advisorRibeiro, Manuel J.-
dc.contributor.authorBarbosa, David Marinheiro-
dc.date.accessioned2015-09-22T09:19:11Z-
dc.date.available2015-09-22T09:19:11Z-
dc.date.issued2015-07-29-
dc.identifier.urihttp://hdl.handle.net/20.500.11960/1341-
dc.descriptionMestrado em Sistemas de Energias Renováveis na Escola Superior de Tecnologia e Gestão do Instituto Politécnico de Viana do Castelopor
dc.description.abstractEste estágio profissional, ao abrigo do programa de estágios do Instituto de Emprego e Formação Profissional, em parceria com a empresa ENEOP 3 teve como objetivo elaborar um estudo sobre melhorias no processo produtivo, de modo a tornar esta empresa mais eficiente, ou seja, reduzir custos de produção, sem pôr em causa a qualidade final do produto. Este foi dividido em três grandes fases, originando cada uma delas um projeto. O 1º Projeto, com duração prevista de dois meses, tem como objectivo determinar o número de pessoas necessárias para efetuar todas as manutenções preventivas das máquinas da unidade fabril ao longo de um ano. O 2º Projeto, com a mesma duração do anterior, tem como objetivo estudar soluções de melhoria em componentes de alguns equipamentos que sofrem um maior desgaste, de modo a tentar reduzir os custos com as suas manutenções. Por último, numa terceira fase, para uma duração de quatro meses foi realizado um levantamento do sistema de aspiração da empresa, efetuando-se também o seu mapeamento e a elaboração do respetivo protocolo de manutenção.por
dc.description.abstractThis professional stage, under the internship program of the Institute of Employment and Training, in partnership with the company ENEOP 3 aimed to prepare a study on improvements in the production process, in order to make this company more efficient, to reduce production costs, without compromising the final product quality. This was divided into three main stages, giving each of them a project. The 1st Project, scheduled to last two months, aims to determine the number of people needed to perform all preventive maintenance of the machines of the plant over a year. The 2nd Project, with the same period of the previous, aims to study improvement solutions in components of some equipment that suffer greater wear, and try to reduce the cost of their maintenance. Finally, in a third phase, with the duration of four months was to develope a survey of the company's vacuum system also making up its mapping and the development of the respective maintenance protocol.por
dc.language.isoporpor
dc.rightsopenAccesspor
dc.titleEstágio profissional na empresa ENEOP3 - Viana do Castelopor
dc.typemasterThesispor
thesis.degree.nameMestrado em Sistemas de Energias Renováveispor
thesis.degree.levelMestrepor
dc.identifier.tid201124114-
Appears in Collections:ESTG - Dissertações de mestrado

Files in This Item:
File Description SizeFormat 
David_Barbosa.pdf2.36 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.