Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.11960/3439
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAlmeida, Joana O.-
dc.contributor.authorDelgado, Raimundo M.-
dc.contributor.authorTeixeira, Paulo F.-
dc.date.accessioned2023-08-01T13:59:09Z-
dc.date.available2023-08-01T13:59:09Z-
dc.date.issued2012-
dc.identifier.citationAlmeida, J. O., Delgado, R. M., & Teixeira, P. F. (2012). Network bridge management with life-cycle cost optimization. In F. Biondini, & D. M. Frangopol (Eds.), Bridge Maintenance, Safety, Management, Resilience and Sustainability: Proceedings of the Sixth International Conference on Bridge Maintenance, Safety and Management, July 8-12, 2012, Italy (pp. 2674-2681). CRC Press. https://doi.org/10.1201/b12352-410pt_PT
dc.identifier.isbn978-041562124-3-
dc.identifier.urihttp://hdl.handle.net/20.500.11960/3439-
dc.description.abstractThis paper presents a strategic medium/long-term intervention planning methodology for managing bridges and other similar structures networks, during their working periods of life, assuring the required safety and serviceability levels and taking the available budget into consideration, useful to minimize the associated high life-cycle costs and also to prepare an eventual extra-budget request argumentation. The methodology processes a set of a different kind of information to achieve some support decision indexes like the minimum life-cycle cost intervention plan on a set of bridges during a medium/long period of time, for different performance levels and respecting all the user’s local and global restrictions. The bridge performance deterioration is predicted with a probabilistic process, the life-cycle cost estimation is based on some expected economical rates and some other considerations grounded on a Portuguese expert judgment base and the final optimization is made with a genetic algorithm.pt_PT
dc.language.isoengpt_PT
dc.publisherCRC Presspt_PT
dc.rightsclosedAccesspt_PT
dc.titleNetwork bridge management with life-cycle cost optimizationpt_PT
dc.typeconferenceObjectpt_PT
dc.date.updated2023-07-31T17:05:55Z-
dc.description.version5A1D-90C1-54FE | Joana Maria Martins Rosa Maia de Oliveira Almeida-
dc.description.versioninfo:eu-repo/semantics/publishedVersion-
dc.identifier.slugcv-prod-95187-
dc.peerreviewedyespt_PT
degois.publication.firstPage2674pt_PT
degois.publication.lastPage2681pt_PT
degois.publication.titleBridge Maintenance, Safety, Management, Resilience and Sustainability: Proceedings of the Sixth International Conference on Bridge Maintenance, Safety and Managementpt_PT
degois.publication.locationItáliapt_PT
dc.identifier.doi10.1201/b12352-410-
dc.identifier.eid2-s2.0-84863922104-
Appears in Collections:ESTG - Artigos indexados à WoS/Scopus

Files in This Item:
File Description SizeFormat 
Alm_NBM.pdf
  Restricted Access
1.25 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.