Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.11960/3487
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAlmeida, Joana O.-
dc.contributor.authorDelgado, Raimundo M.-
dc.contributor.authorTeixeira, Paulo F.-
dc.date.accessioned2023-09-25T18:53:10Z-
dc.date.available2023-09-25T18:53:10Z-
dc.date.issued2016-10-21-
dc.identifier.citationAlmeida, J. O., Delgado, R., & Teixeira, P. (2016). Life-cycle cost optimisation on a set of bridges. In I. S. Oslakovic, G. Klanker, J. Matos, J. Casas, & R. Hajdin (Eds.), COST Action TU1406 : Quality specifications for roadway bridges, standardization at a European level : 3rd Workshop Meeting, 20-21 october, 2016, Delft (pp. 1-6). University of Twentept_PT
dc.identifier.urihttp://hdl.handle.net/20.500.11960/3487-
dc.description.abstractThis manuscript presents a life-cycle cost optimisation methodology for a set of roadway bridges, during a medium or a long period of time. The methodology analyses multiple scenarios and evaluates the performance and cost consequences of implementing different types of interventions, in different periods of time, for each bridge. The methodology takes into consideration the direct and indirect costs associated with different types of interventions, in addition with a degradation model to predict the deterioration along time. The optimisation is performed with a genetic algorithm to find the optimised intervention plan, over the desired analysis period. That process takes into consideration the life cycle cost minimization and the boundary constraints which could be fixed by the decision maker, either in terms of performance or cost. The methodology was tested on set of concrete Portuguese roadway bridges and the results of its application is presented. Attending to the nature of the problem, data’s uncertainty is considered and Monte Carlo simulation Method is used to present the results in a probabilistic manner. To better support the decision, a multi-objective optimisation is also presented. The gathered results are useful to minimize the associated high life-cycle costs of bridges and also to prepare an eventual extra-budget request argumentation. The methodology is then an approach to support decisions related to the scheduling of the necessary interventions on a set of bridges over time, ensuring the required performance level and taking the available budget into consideration.pt_PT
dc.language.isoengpt_PT
dc.publisherUniversity of Twentept_PT
dc.rightsclosedAccesspt_PT
dc.subjectBridges managementpt_PT
dc.subjectLife cycle costpt_PT
dc.subjectOptimisationpt_PT
dc.subjectScheduling of interventionspt_PT
dc.subjectProbabilistic analysispt_PT
dc.subjectDecision support.pt_PT
dc.titleLife-cycle cost optimisation on a set of bridgespt_PT
dc.typeconferenceObjectpt_PT
dc.date.updated2023-07-31T18:48:29Z-
dc.description.version5A1D-90C1-54FE | Joana Maria Martins Rosa Maia de Oliveira Almeida-
dc.description.versionN/A-
dc.identifier.slugcv-prod-3314295-
dc.peerreviewedyespt_PT
degois.publication.firstPage1pt_PT
degois.publication.lastPage6pt_PT
degois.publication.titleCOST Action TU1406 : Quality specifications for roadway bridges, standardization at a European level : 3rd Workshop Meetingpt_PT
degois.publication.locationDelftpt_PT
Appears in Collections:ESTG - Artigos em conferência

Files in This Item:
File Description SizeFormat 
TU1406_DELFT_EBOOK_capa_e_artigo.pdf
  Restricted Access
493.7 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.