Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.11960/3512
Title: | Life-cycle cost optimization in highway concrete bridges management |
Authors: | Almeida, Joana O. Delgado, Raimundo M. Teixeira, Paulo F. |
Keywords: | Bridge management Life-cycle cost Genetic algorithms optimization Markov matrices Monte Carlo analysis |
Issue Date: | 2012 |
Publisher: | LNEC |
Citation: | Almeida, J. O., Teixeira, P., & Delgado, R. (2012). Life-cycle cost optimization in highway concrete bridges management. In M. Salta, R. Moura, a. S. Silva, A. Póvoa, E. Pereira, M. J. Correia, & H. Patrício (Org.), ICDS12 - International Conference : Durable structures: from construction to rehabilitation, 31 maio a 1 junho, 2012, Lisboa (pp. 1-8). LNEC |
Abstract: | A methodology for life cycle cost minimization on a set of highway concrete bridges during a medium/long term period of time is presented in order to help on structures management decision process. This methodology takes into consideration the direct and indirect costs associated to different kinds of interventions during bridges lifetime, uses some Markov Matrices as degradation model and applies a genetic algorithm to identify the optimized intervention plan, considering the available budget and the desired minimum performance level. Data’s uncertainty is treated in a probabilistic way and Monte Carlo Method simulation is used to highlight the most important parameters on the optimized solution identification. |
URI: | http://hdl.handle.net/20.500.11960/3512 |
Appears in Collections: | ESTG - Artigos em conferência |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
ICDS_durable_strucutres_2012_LIFE-CYCLE_COST_OPTIMIZATION.pdf Restricted Access | 1.43 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.