Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.11960/2197
Title: Controlo de qualidade na montagem de torres eólicas em betão armado pré-esforçado
Authors: Oliveira, Carlos
Correia, José A. F. O.
Araújo, Maria José Lima de
Keywords: Construção de betão armado pré-esforçado
Torres eólicas
Montagem
Qualidade
Inspeção
Assembly of post tensioning concrete
Wind towers
Assembly
Quality
Inspection
Issue Date: 1-Apr-2019
Abstract: A indústria da construção civil, encontra-se em permanente transformação, adaptando-se às volatilidades associadas à atividade, quer sejam de origem económica, política ou social. Qualquer que seja a mudança, esta terá necessariamente de assentar na garantia da qualidade, ao abrigo de uma visão moderna de gestão de projetos e nos processos de certificação. Os procedimentos de controlo de conformidade das operações são essenciais ao longo das várias etapas do processo construtivo, pois correspondem ao instrumento essencial para o sucesso do sector. Procurando assegurar ao cliente, a materialização entre o preconizado em projeto e o efetivamente executado em obra, garantindo-se a qualidade do produto final, onde todos os interessados saem a ganhar. As entidades de gestão técnica de empreendimentos, responsáveis pela aplicação dos processos de conformidade, necessitam de ferramentas compatíveis com a melhor política de qualidade a implementar para a persecução desse objetivo.
The construction sector is an activity that is in constant transformation, adapting itself constantly to the volatility demanded by economic, political or social requests. Whatever the change might be it will always necessarily settle in the quality assurance, under a modern approach to project management and certification procedures. The monitoring compliance procedures during the different construction tasks/phases are the essential tool for highest success in the sector. Grants shall be given to the customer, that what is been built is in accordance and fulfills, with a quality standard, with what was initially designed and planned. For the pursuit of that goal, the construction conformity control companies need to implement the compatible tools. In order to reach these goals, entities responsible for the application of the quality compliance process must be fitted with the best tools, methods and procedures in accordance with the best quality demand policy.
Description: Mestrado em Engenharia Civil e do Ambiente : Especialização em Construções Civis na Escola Superior de Tecnologia e Gestão do Instituto Politécnico de Viana do Castelo
URI: http://hdl.handle.net/20.500.11960/2197
Appears in Collections:ESTG - Dissertações de mestrado

Files in This Item:
File Description SizeFormat 
Maria_Araujo.pdf
  Until 2069-04-01
4.63 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.