Utilize este identificador para referenciar este registo: http://hdl.handle.net/20.500.11960/3005
Registo completo
Campo DCValorIdioma
dc.contributor.authorAlmeida, Joana O.-
dc.contributor.authorTeixeira, Paulo F.-
dc.contributor.authorDelgado, Raimundo M.-
dc.date.accessioned2022-12-19T12:13:42Z-
dc.date.available2022-12-19T12:13:42Z-
dc.date.issued2013-
dc.identifier.citationAlmeida, J. O., Teixeira, P. F., & Delgado, R. M. (2015). Life cycle cost optimisation in highway concrete bridges management. Structure and Infrastructure Engineering, 11(10), 1263-1276. https://doi.org/10.1080/15732479.2013.845578pt_PT
dc.identifier.issn1573-2479-
dc.identifier.issn1744-8980-
dc.identifier.urihttp://hdl.handle.net/20.500.11960/3005-
dc.description.abstractThis study presents a life cycle cost prediction and cost minimisation methodology for a set of highway concrete bridges, during a medium or a long period of time, in order to facilitate the decision process of the structure management. This methodology takes into consideration bridge intervention costs in addition with some Markov matrices degradation model. It applies a genetic algorithm in order to identify the optimised intervention plan, considering the available budget and the desired minimum performance level. Some Portuguese direct and indirect cost parameters, associated with different types of interventions during bridges lifetime, are presented. Finally, a probabilistic sensitivity analysis is carried out using Monte Carlo simulations.pt_PT
dc.language.isoengpt_PT
dc.rightsopenAccesspt_PT
dc.subjectBridgespt_PT
dc.subjectInfrastructure managementpt_PT
dc.subjectLife cycle costpt_PT
dc.subjectMarkov modelspt_PT
dc.titleLife cycle cost optimisation in highway concrete bridges managementpt_PT
dc.typearticlept_PT
dc.date.updated2022-12-02T15:18:13Z-
dc.description.version5A1D-90C1-54FE | Joana Maria Martins Rosa Maia de Oliveira Almeida-
dc.description.versioninfo:eu-repo/semantics/publishedVersion-
dc.identifier.slugcv-prod-95172-
dc.peerreviewedyespt_PT
degois.publication.firstPage1263pt_PT
degois.publication.lastPage1276pt_PT
degois.publication.volume11pt_PT
degois.publication.issue10pt_PT
degois.publication.titleStructure and Infrastructure Engineeringpt_PT
dc.identifier.doi10.1080/15732479.2013.845578-
dc.identifier.eid2-s2.0-84931956472-
Aparece nas colecções:ESTG - Artigos indexados à WoS/Scopus

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Life_cycle_cost_optimisation_in_highway_concrete_bridges_management.pdf901.49 kBAdobe PDFVer/Abrir


Todos os registos no repositório estão protegidos por leis de copyright, com todos os direitos reservados.